Blog

PHD in 2026: June Update

Hi Quilting Friends,

Mr. Fix It and I have had a “sporty” June, watching a few NBA playoff games and several World Cup matches on TV.  We enjoy watching “fútbol” since the action is non-stop. Our neighbors have joined us to view several matches, so we have a real cheering section. Astrid and Freya are soccer fans too; they wake up and celebrate with us whenever a goal is scored.

futbol-fans-by-sharon-40-ms-p-designs-usa
World Cup watch party, Frenchie version

We spent Fathers’ Day weekend in San Antonio with our family there.  These guys cooked a delicious breakfast for everyone.

the-cooks-by-sharon-40-ms-p-designs-usa
Kiss the cooks?

The cabrito (baby goat) was delicious, served in soft tortillas with rice and beans on the side; here’s Mr. Fixit with his lunch!

mr-fixit-fathers-day-2026-by-sharon-40-ms-p-designs-usa

And now down to business! We’re at the midpoint of 2026, and perhaps you’ve already finished up the “easy” projects from your list. (I know that I have!) How do we get over the hurdles that lie between us and a finish on those more challenging projects that remain to be completed this year?

Let’s begin by applyling this quote (which may or may not be from Mark Twain; my research was inconclusive) to our PHD projects:

For example, I keep a bucket near my cutting table that I use for scraps that need to be sorted and yardage that awaits a return to its shelf.  I often procrastinate on emptying the bucket until it’s overflowing, mostly because it’s a boring job and I’d rather be sewing.  This might be OK for a while, but eventually the disorder becomes a distraction that interferes with my workflow.

This time it had been at least four months since I had emptied the bucket, so I ate that frog earlier this month.  I put away the fabric pieces, and then sorted and stored the scraps before I did anything else in the studio.  At that point I was on a roll, so I went on to cut out most of the pieces for Project 12 (which I had also been procrastinating).  That’s two frogs consumed in a single day! I was able to keep going on activities that were more engaging for me after eating my frogs, since action builds momentum.

Do you have a frog in your studio?  Perhaps there are several frogs who are waiting to be eaten! 🐸🐸🐸 Try eating that frog first, and see what happens next.  Please share your results in the comments.


Here’s my PHD update for June.


each-dawn-a-new-day
may-28-progress-by-sharon-40-ms-p-designs-usa
May 28
june-28-progress-by-sharon-40-ms-p-designs-usa
June 28

Project #5: “New” FPP Blocks (4 designs)

wonky-flowers-1-by-ms-p-designs-usa
wonky-flowers-2-by-ms-p-designs-usa
wonky-flower-by-ms-p-designs-usa-2

I’m awaiting inspiration for the other new FPP designs.  Maybe I’ll create another tractor, a different flower, a star, or another wonky block?  I just don’t know yet, so stay tuned!

Project #6: “New” Coffee Mug Throw Quilt

  • January Mug by Sharon @ Ms P Designs USA
  • april-coffee-mug-by-sharon-40-ms-p-designs-usa.
  • march-coffee-mug-by-sharon-40-ms-p-designs-usa
  • april-mug-by-sharon-40-ms-p-designs-usa
  • june-mug-by-sharon-40-ms-p-designs-usa
  • may-coffee-mug-by-sharon-40-ms-p-designs-usa
  • june-coffee-mug-by-sharon-40-ms-p-designs-us
  • october-mug-by-sharon-40-ms-p-designs-usa
  • march-mug-by-sharon-40-ms-p-designs-usa
  • may-mug-by-sharon-40-ms-p-designs-usa
  • february-coffee-mug-by-sharon-40-ms-p-designs-usa
  • august-mug-by-sharon-40-ms-p-designs-usa
  • september-mug-by-sharon-40-ms-p-designs-usa
  • january-coffee-mug-by-sharon-40-ms-p-designs-usa
  • february-mug-by-sharon-40-ms-p-designs-usa
  • july-mug-by-sharon-40-ms-p-designs-usa
fabric-pull-by-sharon-40-ms-p-designs-usa
cubix-runner-wip-by-sharon-40-ms-p-designs-usa
Scrappy Basket Set 2 by Sharon @ Ms P Designs USA
pastel-zipper-bag-by-sharon-40-ms-p-designs-usa
honey-bee-bag-kit
lupine_laughter_from-bonnie-hunter.

It’s a wrap!  I’ve finished up the quilting and binding on this scrappy beauty.

upine-and-laughter-quilt-by-sharon-40-ms-p-designs-usa-

My scraps and stash fabrics were more than sufficient to make this 80″ x 80″ lovely. I used the color palette suggested by the designer, mostly because I had plenty of scraps in those colors, but also because I think it’s a pretty combination.

I’m not sure what I’ll do with this quilt now that it is all done, but I’m certain that I’ll find an excellent “home” for it.  I have several great nieces who don’t have a quilt from me (yet).


New Projects

Nope.  Just nope.


Ongoing Projects

Click the images to read more.

Coffee Mug Blocks
june-coffee-mug-by-sharon-40-ms-p-designs-us
“Signature” Blocks
june-signature-blocks-by-sharon-40-ms-p-designs-usa

PHD Progress Update

This is my updated PHD task list, shaded to show the finished tasks and looking fine (if I say so myself).

june-task-list-update-by-sharon-40-ms-p-designs-usa

This is my updated PHD tracker. As you can see, I’m back on schedule with 6 finishes for the year, despite my slow start. Yay!

june-phd-tally-by-sharon-40-ms-p-designs-usa

Party Time!

You are invited to the Inlinkz link party!

Click here to enter

https://fresh.inlinkz.com/js/widget/load.js?id=c0efdbe6b4add43dd7ef

We would appreciate a link back from your post to this post. Here’s a link to copy and paste.


7 thoughts on “PHD in 2026: June Update

  1. You’ve had a good first half of the year. Looks like you are on track with your PHD. Since I’ve been retired and had more time to sew, I’ve learned to pick a priority and stick with it till it’s done. That’s made it easier to get things to the finished point. Good luck with your second half of the year projects.

    Liked by 1 person

Leave a comment