Blog

#2026QuiltingCheckIn: Q3

Hi Quilting Friends,


Goal 1: Play with UFO’s

each-dawn-a-new-day
  • january-3-progress-by-sharon-40-ms-p-designs-usa
  • june-28-progress-by-sharon-40-ms-p-designs-usa
  • july-26-progress-by-sharon-40-ms-p-designs-usa
  • august-29-progress-by-sharon-40-ms-p-designs-usa
  • 10-september-22-progress-by-sharon-40-ms-p-designs-usa

I need to carefully press the finished piece, attach the ten brass charms that came with the kit, and purchase a frame and some supplies. I’m sure to have this lovely finished before the end of 2026.

Goal 2: Play with Scraps

Scrappy Basket Set 2 by Sharon @ Ms P Designs USA

My goal for Q3 and Q4 is to complete a minimum of 8 scrappy projects by the end of 2026, with at least one of them a throw-sized or larger quilt.

  • july-aqua-a-zipper-bag-by-sharon-40-ms-p-designs-usa
  • august-yellow-zipper-bag-a-by-sharon-40-ms-p-designs-usa
  • september-zipper-bag-b-by-sharon-40-ms-p-designs-usa
christmas-bells-by-sharon-40-ms-p-designs-usa
WIP – Christmas Bells place mat set
fpp-hearts-by-sharon-40-ms-p-designs-usa
WIP – Caffeine Addict throw quilt
south-cottonwood-july-31-2022-1st-bridge by Sharon @ Ms P Designs USA
fashionable-accessory-august-23-2026-by-sharon-40-ms-p-designs-usa
Fashionable accessory

2 thoughts on “#2026QuiltingCheckIn: Q3”

  1. You’ve done well with your goals this year. I get the frustration of not being able to do the physical stuff. I had to re-adjust my weight lifting plans when a knee and back injury side lined me for most of the spring and summer. Hope the stationary bike works out for you.

    Liked by 1 person

Leave a comment